New Milford Highway Department

Phone: (860) 355-6045 or Main Office: (860) 355 -6040

Fax: (860) 355-6055

Office Hours: 7:30-4 pm M-F Labor Day to Memorial Day (6:30-3 pm M-F Memorial Day to Labor Day)

Email: public_works@newmilford.org

Highway Superintendent: Gerald Hollins jhollins@newmilford.org 

Public Works Foreman: Joe Tillman jtillman@newmilford.org

The Highway Department is comprised of a superintendent, public works foreman and 32 highway maintenance personnel including a vehicle maintenance supervisor and four vehicle maintenance personnel.  The Public Works Department owns 24 dump trucks, five small trucks, two front loaders, two graders, two backhoes, five pick up trucks, a van, an excavator, a paver, a 10 and 5 ton roller, a catch-basin cleaner, three sweepers, and various other tractors and small equipment.  In addition our Vehicle Maintenance Division maintains more than 15 vehicles and pieces of equipment for other town departments and agencies.

Annual report 2009-2010:

The Highway Department is responsible for the maintenance, drainage and snow plowing for all 196 miles of paved roads and 26.18 miles of gravel roads throughout Town. Besides the obvious basics of paving and plowing, Highway: cleans catch basins, sprays guide rails for weed control, repairs guide rails, sweeps, grades gravel roads, maintains drainage, plants trees, clears downed trees and branches, installs drainage, repairs and conducts preventative maintenance on Town vehicles, installs flags, beaver dam removal, installs and replaces signs, line stripes, patches potholes, fixes and installs curbing, responds to CSR’s [459 this year], rakes, seeds and hays new drainage installations, and mows roadsides, just to name a few daily jobs.

 

Below is a list of regular maintenance items that we perform:

Ø      guardrail weed spraying

Ø      paving

Ø      sweeping – including multiple sweepings of the Downtown and other areas by 2   to 3 sweepers, water truck and haul trucks. This accounts for all     roads     in New Milford being swept at least once by the end of spring.

Ø      64+ acres of mowing and brush cutting

Ø      1,050  catch basins were cleaned

Ø      1,479 CY of various stone for gravel roads was used to repair gravel roads. This is a significant decrease from previous years due to the new application and process described below. Last years process used on gravel roads alone was 12,043 CY.

Ø      Highway continued with the crack sealing process along various roads as well.

 

This year the Highway department made their own process by using materials reclaimed in the yard as well as many applications of Envirobrine to the surface to help bind the process together. The practice of adding Envirobrine has been used before, but this year highway continued the practice after every grading instead of just in the spring and fall. The success was measured by the firmness of the gravel road surfaces even after a heavy rainfall.

 

---------------------------------------------------------------------------------------------------------

For further questions, please contact us at (860)355-6040 or use the webpages below.

Road Updates

Projects and Grants

Engineering Department Webpage

Department of Public Works Webpage

Town of New Milford Webpage newmilford.org